Case study

AVA Bridge

The bridge provides significant reductions in material and build time with offsite manufacture and minimum impact onsite during assembly. It is designed to be different, the configurable nature of the bridge design means that AVA can fit any station, anywhere. Its is Beautiful & low maintenance due to a light and robust stainless-steel frame and faceted cladding and is simple to install and can connect communities that have previously been unable to benefit from bridges and is created by a world-class team of engineering, manufacturing and construction specialists

Project overview
Project name:
AVA Bridge
Client:
Walker UK Construction/Network Rail
Project value:
£10m
Completion date:
Current
Types of Trades:
PTS qualified operatives, including: Supervisors, Carpenters, Steel Fixers, Groundworkers, Labourers, Traffic Marshalls, Concrete Finishers, Machine Operatives, Engineers.