Case Studies
See how we've helped businesses like yours
Client: Walker Construction
Old Oak Common
This project forms part of the enabling works for HS2 where our client is tasked with enabling, groundworks and bridge replacements. Works will interface with Network Rail and London underground with all upskilling of operatives performed in house for the benefit of the project. Our teams will be on site until late 2024.
Client: Carey’s
Battersea Power Station
Role Group has provided trades and labour to help Careys on this iconic build at Battersea Power Station. Works included, paving with York stone and granite, groundworks such at ducting, kerbs, concrete foundations including steel works
Client: Morrison Water Services
Minor Capital Works
In April 2023 we were awarded a place on the Morrison Water services framework to provide full traffic management set up and maintenance cover London and Thames Valley. This involves setting up of various TM set ups from 2/3/4 way to Lane/Road closures to Ped crossings and daily maintenance of all. This framework will last for up to 8 years
Client: Lanes for Drains
Occupational Health Services
Role Training have been providing Lanes for Drains with Railway Medical’s, Drugs and Alcohol Testing, and Fit for Work Medical assessments.
Client: Rail Futures
Safety Critical Training
Role Training work closely with Rail Futures providing Railway Safety Critical, First Aid and Manual Handling courses.
Client: Cottier Contracting
University of Essex
Role are currently providing professional services for project management and skilled trades for finishing works at the University as they renovate the external landscape of the university
Client: Erith Contractors
Avon Way, Didcot
Role provided multiple phases of set ups for this scheme over a 12 month period. The client was creating new site entrances on 2 roundabouts in the area and 2, 3 and 4 way set ups were required at various times including lane closures and diversions. All design and council applications were provided by Role.
Client: Kelly Rail
Northampton to Rugby Troughing Routes
We are providing gangs on this route works to facilitate the replacement and upgrading of the troughing route. We have multiple gangs working days, nights and weekends. This will be a 2-year project.
Client: Walker UK Construction/Network Rail
AVA Bridge
The bridge provides significant reductions in material and build time with offsite manufacture and minimum impact onsite during assembly. It is designed to be different, the configurable nature of the bridge design means that AVA can fit any station, anywhere.
Client: Hochtief
Highbury Corner Tunnels
The road over rail bridge sits over 2 busy rail lines and the Highbury & Islington Overground station, and despite the complexities of the project, the build resulted in a minimal 195-hour rail possession.
Client: Wates Group
Clarence Avenue
We are currently providing a 2 way set up with 2 ped crossings and man on sire services and night security on the scheme in Clapham, London. This is a 2 year project which we have designed, installed and are managing for the client.
Client: Morrison Water Services
Agility Alliance
As part of the Agility Alliance framework we have delivered multiple Traffic Management set-ups across the infrastructure covering London and the Thames Valley region ranging from 2/3/4 way set-ups to road closures and diversion routes.
Client: J. Murphy & Sons Limited and Morrison Utility Services JV
Agility Alliance
The scope of works includes the following; clean water network repair, rehabilitation and maintenance and leak detection, along with constructing new water mains. The aim of the alliance is to drive down leakages and reduce disruption to Thames Water customers by repairing, maintaining and reactivating water networks.
Client: Erith Contractors
Scale Space Buildings A and B, Imperial College London
Role Group are currently providing professional services for project management and skilled trades to the innovative Scale Space Buildings at Imperial College London.
Client: Walker Construction
Wessex Capacity Alliance
The alliance worked in collaboration to provide the full design and construction to bring the Waterloo International terminal back into use. The full extent of the project included platform modifications at Waterloo station and improvements to the outlying stations and rail systems.
Client: Hochtief
Highbury Corner Tunnels
Role Group won the prestigious contract for the Highbury Corner project to provide skilled and experienced rail operatives to the TfL’s Structures and Tunnels Investment Portfolio (STIP). The project involved the demolition and reconstruction of Highbury Corner bridge, which carries the A1 highway.
Client: Walker Construction
Southall Waterside – Berkeley Homes
The initially key steps of the project saw Role Group provide professional trades and labour to complete the required land remediation and site preparation works.